None of the new Lake Okeechobee plans solve all of the problems

Sam Sterrett, Boca Raton, paddles into the Lake Worth Lagoon with her dog Maya in John D. MacArthur State Park Beach in North Palm Beach, Fla., on Friday, June 4, 2021.

For the first time since the Lake Worth Lagoon was perverted by saltwater inlets gouged into its sides, it may officially be considered an estuary by water managers – a move that would offer protections from belching discharges of black muck.

The ascension in ecological stature for the 20-mile lagoon is included in proposals being considered by the Army Corps of Engineers in the new management plan for Lake Okeechobee.

Lake Worth Lagoon’s designation in the current plan adopted in 2008, and previous iterations, was simply as an outlet for water going south, another drain for Lake Okeechobee without much consideration given to its environmental health and community importance.

The result was decades of damaging releases through the C-51 canal of sediment-laden water from Lake Okeechobee and a watershed 42-times larger than the lagoon itself.

“Just the thought that the lagoon was ever considered part of our flood control system I find so disturbing because it is an estuary. No wonder it needs a lot of help,” Everglades Law Center Executive Director Lisa Interlandi said. “I think this is the key to the lagoon moving forward.”

About eight thousand gallons per second of water flows through the South Florida Water Management District's Control Structure S-155 on Canal C-51 in Spillway Park east of Dixie Highway near the Lake Worth and West Palm Beach, Fla. city limits on February 1, 2016. SFWMD is moving water to control canal levels after unprecedented rainfall in the last few months in south Florida. (Thomas Cordy / The Palm Beach Post)

Details of the new plan, which is saddled with the title of “Lake Okeechobee System Operating Manual”, or LOSOM, were debated Thursday at a South Florida Water Management District Governing Board meeting.

The Corps is expected to announce its tentative choice from six proposals on Monday, but the public will have a chance to weigh in until a more finalized plan is decided on Aug. 4. That plan will continue to be tweaked until October.

Source News